Achieving Reliability in a Variable Construction System - Blue Ocean HPA

Accountability | Advisory | Coaching | Consulting

Back to blog items!

Reliability is often seen as a distant goal in the construction industry, something nice to have, but seemingly impossible to achieve in the face of constant change, uncertainty, and complexity. Projects involve a wide variety of stakeholders, processes, materials, and external constraints that fluctuate daily. With so much variability, how can construction teams ever build a system that produces consistent and predictable outcomes?


The answer lies not in eliminating variability, which is neither realistic nor always desirable, but in designing systems that can manage and respond to variability while maintaining reliability. This is a core principle of Lean Construction and an essential mindset shift for the industry to overcome persistent productivity and performance challenges.


In this blog, weโ€™ll explore:

๐Ÿ‘‰ What reliability really means in construction

๐Ÿ‘‰ Why variability is inevitable (and sometimes necessary)

๐Ÿ‘‰ The principles and practices that help create reliable outcomes in variable systems

๐Ÿ‘‰ Real-world applications and practical steps


What Is Reliability in Construction?

In simple terms, reliability is the ability to consistently deliver on what was promisedโ€”on time, on budget, and to the required quality. In a production environment, reliability means processes and teams perform as planned with minimal deviation.


In the construction context, this translates to:

๐Ÿ‘‰ Milestones and tasks being completed on time

๐Ÿ‘‰ Work ready to begin when scheduled

๐Ÿ‘‰ Dependencies between trades being honored

๐Ÿ‘‰ Minimal rework or error

๐Ÿ‘‰ Trust between stakeholders based on performance


Reliability isn't just about meeting deadlines; itโ€™s about building a system where commitments are credible and outcomes are predictable, even when conditions change.


The Challenge: Construction as a Variable System

Construction projects are inherently variable systems. The sources of variability are numerous:

๐Ÿ‘‰ Design changes mid-project

๐Ÿ‘‰ Weather conditions

๐Ÿ‘‰ Labor availability and skill levels

๐Ÿ‘‰ Material delays or quality issues

๐Ÿ‘‰ Site-specific constraints

๐Ÿ‘‰ Unforeseen conditions in existing structures or soils

๐Ÿ‘‰ Inter-trade dependencies and miscommunications


Add to this the fact that most projects are temporary organizations, assembled just for the duration of a single job. Teams often have no shared history or standard work practices, making coordination more difficult and increasing the potential for error.

This variability makes it extremely difficult to treat construction as a traditional production system, yet the solution isnโ€™t to force it into rigidity. Instead, the aim is to create flow with reliability despite the variability.


Lean Perspective: Embrace Variability, Manage It Systemically

Lean Construction doesn't pretend variability can be removed. Instead, it asks: How can we design systems that can absorb variability while still delivering reliable outcomes?

To do this, we must understand the difference between controllable and uncontrollable variability, and introduce buffers, feedback, and flow to maintain stability.


Here are six principles to guide the way:


1. Stabilize What You Can

The first step in managing a variable system is to identify and stabilize the parts of the process you can control.


Examples include:

๐Ÿ‘‰ Reliable procurement processes

๐Ÿ‘‰ Clear scopes of work and detailed planning

๐Ÿ‘‰ Daily huddles and visual management

๐Ÿ‘‰ Standardized work for repeated tasks (e.g., formwork, framing, inspection checklists)


By removing unnecessary variability from inputs and processes you can control, you reduce the overall volatility of the system and create a more solid foundation for performance.


2. Use the Last Plannerยฎ System to Build Trust and Flow

The Last Planner System (LPS) is a collaborative planning methodology that focuses on creating reliable work plans based on actual constraints and commitments.


Key elements include:

๐Ÿ‘‰ Phase Planning: Aligning all stakeholders on milestones and constraints

๐Ÿ‘‰ Lookahead Planning: Identifying and removing constraints ahead of time

๐Ÿ‘‰ Make-Ready Planning: Ensuring work is executable before it's scheduled

๐Ÿ‘‰ Weekly Work Planning: Teams make reliable commitments for the week

๐Ÿ‘‰ Percent Plan Complete (PPC): Measuring plan reliability to drive learning


The Last Planner System works because it connects the people who are closest to the work (the โ€œlast plannersโ€) with the planning process. Instead of pushing unrealistic schedules, it pulls work based on readiness and capacity, which dramatically increases reliability.

We have also used our digital enabling system P2IC to better control data and to help allow projects and businesses to drive continuous improvement.


3. Buffer for Variabilityโ€”But Strategically

Buffering is essential in any variable system. In Lean, buffers come in three forms:

๐Ÿ‘‰ Capacity buffers: Having extra labor or equipment available to absorb variation

๐Ÿ‘‰ Inventory buffers: Staging materials ahead of time (not excessively)

๐Ÿ‘‰ Time buffers: Adding float between critical activities or using takt-based buffers


But buffering must be strategic. Excessive buffers lead to waste. Too little leads to chaos. The goal is to create flexibility without slack, ensuring flow can continue when things inevitably go wrong.


4. Build Reliability Through Commitments

Reliability isnโ€™t just about processes, itโ€™s also about people making and keeping commitments. Thatโ€™s where cultural change is required.

Construction teams often avoid committing to tasks because they know the system is unreliable. But when teams collaborate to make achievable commitments, and those commitments are tracked and respected, the system becomes more trustworthy.


This is why LPS emphasizes commitment-based planning, and why itโ€™s important to create a culture of accountability without blame.


5. Measure and Learn from Variance

To improve reliability, you need to understand why plans fail. Thatโ€™s where variance tracking comes in.


Tools like:

๐Ÿ‘‰ Percent Plan Complete (PPC)

๐Ÿ‘‰ Root Cause Analysis (5 Whys)

๐Ÿ‘‰ Constraint Logs


โ€ฆhelp identify patterns of failure. Are tasks incomplete because of missing materials? Late design changes? Overloaded teams?

With real data, teams can adapt their plans and improve their reliability over time, turning every project into a learning opportunity.


6. Design for Flow, Not Just Tasks

Most traditional construction schedules are organized by task completion, often ignoring handoffs, dependencies, and flow between trades. This leads to peaks and valleys in productivity, rework, and schedule delays.


Instead, construction should be managed as a production system, with attention to:

๐Ÿ‘‰ Trade handoffs

๐Ÿ‘‰ Workflow sequencing

๐Ÿ‘‰ Crew flow and location-based scheduling

๐Ÿ‘‰ Pull planning and takt time


When work is planned to flow smoothly across the value stream, variability has less disruptive impact and reliability increases dramatically.


Real-World Application: The Parade of Trades

One of the most revealing Lean simulations is the Parade of Trades game. It shows how one tradeโ€™s unreliability affects the entire system.

In a simplified model, if each trade is only 70% reliable, then the system reliability drops exponentially. Even with five trades, overall reliability may fall below 20%.

This reinforces a key insight: individual productivity does not guarantee system reliability. You must design the entire system for reliable performance, through coordination, flow, buffers, and feedback.


Conclusion: Reliability Is a System Outcome

You canโ€™t demand reliability in a variable system, you have to design for it. In construction, this means:

๐Ÿ‘‰ Engaging all stakeholders in planning

๐Ÿ‘‰ Managing constraints proactively

๐Ÿ‘‰ Building buffers thoughtfully

๐Ÿ‘‰ Tracking and learning from variation

๐Ÿ‘‰ Creating a culture of commitment and collaboration

๐Ÿ‘‰ Structuring work to flow, not just to get tasks done


Lean Construction offers the tools and mindset to make this happen. It doesnโ€™t eliminate variabilityโ€”but it shows us how to harness it to build more reliable, more productive, and more trustworthy project outcomes.


Final Thought

In a world where complexity and uncertainty are the norm, reliability becomes a competitive advantage. Projects that finish on time and on budget arenโ€™t just lucky, theyโ€™re built on systems that respect the reality of variation and are designed to deliver regardless.


The next generation of construction performance will be driven not just by technology, but by system thinking, human coordination, and reliable processes. And that starts with a commitment to mastering reliability in a variable world.

"Copyright ยฉ. All rights reserved. Reproduced with permission from ALL 3rd parties where applicable"